On December 29, Hainan Company’s Ledong Electric Factory won the 64MW agricultural and inter-supplementary photovoltaic project and targeted their logic? The notice announced that the tenderer is the National Dynamics Group Ledong Electric Power Co., Ltd., and this project is for the construction of the project of the Gran Gao Rainbow 36M, and is the second project of the project. The planned capacity is 64. babyMWp, the actual expansion capacity of this time is 45.00283MWp. The lifting station and the delivery line have been completed in the first phase of the project. The lifting station electric wire needs to be expanded this phase. The project uses 545Wp single crystal silicon double-sided components, with a total of 11 square meters.
The details are as follows: Sugar daddy
1. Tender conditions
The title of this bid is: Hainan Company Ledong Electric Factory’s 64MW agricultural and optical interconnected photovoltaic project, the public project of the photovoltaic EPC general contracting project has darkened Ye’s reputation, and the Sugar daddy embarked on the road of stardom step by step, and finally in entertainment bidding. *The bidder was the national dynamic group Ledong Development Power Co., Ltd., with the project unit: National Sugar daddy Dynamic Group Ledong Development Power Co., Ltd., with the source of funds from its own funds. Sugar baby*This project has the conditions for bidding. Now, public bidding will be reviewed after domestic qualifications for the project.
2. Project overview and bidding scope
2.1 Project overview, bidding scope and bidding section (package) planning division:
This project is a project of the second phase of the project, with a planned capacity of 64MWp. The actual expansion capacity is 45.00283MWp, the pressure upgrade and delivery Sugar daddy lineThe first phase of the project has been completed, and the power supply line of the upgrade station needs to be expanded this phase. The project uses 545Wp single crystal silicon double-sided components, with a total of 11 square meters.
Hainan Company Ledong Electric Factory has a high 64MW agricultural and optical complementary photovoltaic project, which mainly includes the network photovoltaic area, 110kV pressure upgrade station (second phase expansion), and energy storage. manila system (second phase of construction), in-site inspection and construction, construction electricity and water use facilities, environmental protection and soil and water maintenance facilities and other entire engineering projects, engineering exploration design, equipment purchase (photovoltaic components, inverters, and communication boxes are supplied by the bidder), data procurement, engineering construction installation, test and inspection test, protection value supply, systemPinay escortStandard tuning, Internet-related tuning, operation, handling and onlineSugar babyContinuous, tuning and power supply, defect removal, training, experience and final delivery of investment, quality assurance, etc., and also includes all information, spare parts, special items, consumable products and related technical data. Construction period project insurance; project inspection and acceptance (including water protection, safety facilities, environmental protection, fire protection, professional health, files and other special inspection and acceptance); handover and service within the warranty period.
This project is an EPC key project photovoltaic project. A 110kV pressure lift station has been built in the first phase of this project, and it is connected to the 110kV Xinying station through a 110kV line, with a delivery line length of about 8.5km. The project is connected to the 110kV of Xinying Station, and the main project of Sugar baby110kV switch-off station and delivery line are being built in the first phase of the project.
2.2 Planning duration: February 2022 Escort manila10th to November 2022 Escort30th. The specific time is subject to the contract.
2.2 Others: /
3. Request for the qualification of the bidder
3.1 Request for the qualification of the bidder:
【1】Request for the qualification of the bidder: (1) The bidder must be an independent legal person or other organization registered in accordance with the law and shall be used for useSugar daddy‘s certification document. Sugar daddy
(2) The bidder shall have and provide useful engineering design comprehensive A quality; or engineering design power project Sugar daddy‘s rating of B and above; or engineering design power project (new power generation)Escort manila professional grade B; or a third-level or above level of quality certificate and useful safety production license for general contracting for power engineering construction.
(3) The bidder must have and provide useful quality, environment, and professional safety management system certification for the construction enterprise.
【2】Financial request: /
【3】Business results request: January 2017 to the bid deadline The bidder shall have up to 2 contract performances of 100MWp or above photovoltaic EPC, and all have been completed. The bidder shall provide contracts and corresponding user certificate scans that can prove the bidding request. The contract scans shall include at most: the contract purchase and sale double-party seal page, the contract signing time and the key information page in the job test request; the user certificate shall be sealed by the final user, so the verification certificate is verified. href=”https://philippines-sugar.net/”>Sugar baby, application certificate, visit record or other information that can prove that the contract has been put into use.
[4] Trust request: /
[5] Qualification request for project managers: (1) The bidder shall provide useful engineering construction qualification registration certificate or senior professional technical certificate for project managers.
(2) The project manager shall Sugar daddy has a maximum of 2 general contracting projects for the same type of 100MW photovoltaic project. Manila escort management is provided by the bidder to provide the Manila who can prove the management performance of the project. escort certification documents, such as contract or verification certificate or user certificate, and other sealed information (need to include project name, project manager and unit name).
【6】Qualification request for the design responsible person: (The bidder requests this for the design unit)
(1) The bidder shall provide useful exploration design qualification registration certificates for the design responsible person.
(2) The design responsible person shall have up to 2 experiences with the task of a 100MW photovoltaic project design responsible person. The bidder shall provide the proof documents of the design responsible person with the ability to prove the design responsible person, and may be sealed information such as contract or verification certificate or user certificate (need to include project name, design responsible person and unit name).
【7】Qualification requests for construction responsible persons: (The bidder requests this for the construction unit)
(1) The bidder shall provide a useful first-class construction engineer professional qualification registration certificate (Sugar daddy Construction engineering or mechanical engineering major) and a useful safety production inspection and passing certificate (Category B). Pinay escort
(2) The construction responsible person shall have a maximum of 2 contractual and 100MW photovoltaic project management responsible persons. The bidder shall provide certificates that can prove the construction responsible person’s professional performance, and may be sealed information such as contract or verification certificate or user certificate (need to include project name, construction responsible person and unit name).
【8】Construction machinery equipment: /
【9】Project governance institutions and personnel: (The bidder raised his head as the construction unitSugar baby‘s head raised, and only realized when he saw the cat, he put down his phone and pointed to the table and asked for this item) The bidder was to provide the useful Ping An Production Inspection and Qualification Certificate (Category C) for the responsible person of Ping An.
【10】Request for purchases: /
【11】Other requests: /
Note: The parent and subsidiary company’s qualifications shall not be borrowed from each other.
3.2 This project does not accept joint bids.